All three generators of Norochcholai Power plant reconnected to national grid
All three generators at the Norochcholai Lakvijaya Power Plant have been reconnected to the national grid following maintenance shutdowns, with the plant back in normal operation and full capacity restored as of January 20, 2026. source http://www.adaderana.lk/news.php?nid=117355